I need it in 48hrs!!!
Airline Ticket Purchase
System
Project Deliverables
(Please include a section in the document for each of the below)
The project requires students to
perform three phases: (a) requirements analysis, (b) system and database design,
and (c) a project plan. Note that in the phase 3, students are required to use
the MS Project software for their project schedule.
The deadline for the Individual
Project can be found in the schedule section of the class syllabus.
The following layout format
covering a title page and all three phases is recommended for the project.
Title page (project name, author,
and date)
Phase 1: Requirement
analysis
A. Problem definition
B. Issues
C. Objectives
D. Requirements
E. Constraints
F. Description of the proposed
system
G. Logical model design
Data flow diagrams
Context diagram
Diagram 0
Descriptions of processes in each
diagram
Descriptions of
outputs/inputs/performance/security or controls
H. Specific requirements, if any
(interface, operational, resource, performance, etc.)
Phase 2: System and
database design
A. User interface
Design an overall user interface
consisting of screens, commands, controls, and features to enable users to use
the system.
How data will be input to the
system?
The physical layout for each
input
The input design and procedures
How data will be output from the
system?
The physical layout for each
output
The output design and procedures
B. Data design
Develop a plan for data
organization, storage, updating, and retrieval.
Database design
Database tables with their
attributes should be presented
Primary key(s) should be
identified in each table, if any
Three steps of normalization
should be included.
Entity-relationship diagrams
Data file storage and access
C. System architecture
Determine the architecture of the
system as Web-based interface, client/server architecture, Internet/Intranet
interface, network configuration, etc.
Phase 3: Project plan
A list of tasks or activities
needed for implementing the proposed system
Estimating completion time and
costs
A project schedule for performing
those activities (Gantt charts or PERT charts)
Note that there is no other
required software package except the MS Project software in this ITEC-630
course. As a result, you are only required to use the MS Project software to
handle the scheduling part of the project and for other parts, you can use any
word editing software or any drawing tools software.
