Given in the following table are the tasks necessary for final assembly of a hospital bed, the length of time needed to perform each task, and the operations that must be completed prior to subsequent operations. Construct a precedence diagram and balance the assembly line for a desired cycle time of 14 minutes. Draw a schematic diagram of the balanced line. How many beds can actually be assembled in an eight-hour period?
|
Element |
Precedence |
Time (min) |
|
A |
None |
4 |
|
B |
None |
5 |
|
C |
None |
8 |
|
D |
A |
4 |
|
E |
A, B |
3 |
|
F |
B |
3 |
|
G |
D, E |
5 |
|
H |
F |
7 |
|
I |
G, H |
1 |
|
J |
I |
7 |
|
K |
C, J |
4 |
Categories:
