Part 2: New Material for System Development Section
- The organization has asked for a new Web-based customer tracking system to be developed. Take this opportunity to describe the differences between a waterfall model and a prototype.
- Describe the steps that will be undertaken during the development of the system using a waterfall model.
- Define each step, and describe what activities will be completed to develop the specific system.
- This information should be 2–3 pages of details.
- Finally, by this week, everything through Week 4 should be complete and ready to hand in as a draft of the Key Assignment.
Categories:
